FAQs-Prototyping

What BEST needs to build your fast turn PCBs
Parts Shortages
Turnaround Prototype Delivery Schedule
BEST Liability
Other Clarifications
Payment Processing
Functional Testing

What BEST needs to build your fast turn PCBs

  • The clock starts when funds have been transferred to BEST, we have your shipping info and the last parts have been received. Parts received after 12:00 pm CST are considered received the following day. BEST is conveniently located in the middle of the US near a major international airport (Chicago) for fast shipment anywhere in the world.
  • We require all build data 24 hours prior the receipt of parts. This data includes:
    1. Bill of materials in Excel or Delimited Format
    2. Customer drawings including any special instructions
    3. Gerber files provided on CD or uploaded to BEST FTP site
  • 5 or 5% extra parts (whichever is more) for all SMT passive components, 20% for 0603 and smaller devices
  • For larger active components (including BGAs) we ask for 1 extra, to compensate for any damages.
  • We expect that the PCB has reference designators & polarity signs be clearly marked.
  • All parts with pin 1 or polarity must show some visible mark for identification. If a part is not clearly marked with polarity indicators, customer will have to provide that information.

Parts Shortages
  • We log in and inspect all kitted parts prior to the beginning of the prototype build, checking it against the supplied documentation.
  • If we are provided the incorrect part (according to the BOM) we will not place it and notify you in our production report when the boards arrive.
  • In the event of a shortage, we will contact you by phone and/or e-mail and postpone the build for as long as 1 hour, in order to resolve the problem.
  • If you would like us to stop the PCB build and resume once parts have arrived, we will charge an additional 20% of your order amount to stop and then re-start the assembly process.

We guarantee the fast turnaround prototype delivery schedule as long as
  • We are shipping to an address in the US
  • All kitted parts match their respective pads on the PCB.
  • All kitted parts, including the PCB, are defect-free
  • All necessary data is received 24 hrs prior to the arrival of the parts kit.
  • The Gerber file and BOM both have reference designators.

    All orders received after 12 p.m. CST are considered received the following day.


BEST Liability
  • BEST warrants each assembly for workmanship up to 90 days after shipment. BEST will repair the assembly or credit the quoted cost of the placement at our option.
  • BEST gives no other warranty, either expressed or implied, and specifically disclaims all other warranties, including warranties for merchantability and fitness.
  • BEST liability will be limited to the amount of the order.

Other Clarifications
  • Credit card (MC or VISA) will be charged at the time of order over the phone.
  • A $40 export handling fee will be charged for all orders outside the US.

Payment Processing
  • We only accept credit cards (MC or VISA) for your first order. If you wish to setup an account you must have a minimum of three orders during consecutive months, paid within terms. Applications for account are subject to our approval.

Functional Testing
  • For small quantity production builds we recommend functional testing of the assemblies. This insures that a high degree of outgoing QC levels
Prototyping Home
Who We Are
Why BEST for Prototyping?
Best Prototype/Micro OEM Build Capabilities
Prototype Estimator
Request for Quotation
Kitting Requirement
FAQs-Prototyping
 



  To obtain a quote from us, or to discuss your specific application in more detail, call us at: 847-797-9250  



 


 



  We appreciate all comments and suggestions you might have. Please click here to send us your feedback.  
3603 Edison Place - Rolling Meadows, IL 60008 - Phone 847.797.9250 - Fax 847.797.9255
Copyright© 2010 All rights reserved. Business Electronics Soldering Technologies | Chicago Internet Marketing Company